Planning, Design, & Pre Construction Phase

Over View

It is during this Planning, Design, & Pre Construction Phase that the scope and budget of the project is defined.  At this phase, our Construction Management Team can be used as a sounding board in providing information and analyzing alternatives for both the architect/engineer and owner.  It is in working through and under the direction of the architect/engineer during the design and planning stage that maximum value can be added to the project (i.e., space used, energy efficiency, design, mechanical systems, structural integrity, and market value). 

 

The major undertakings by our Construction Management Team during the planning, design, & Pre-construction phase include:

  • Assisting the architect/engineer in defining the owner’s needs and setting the project criteria.

  • Providing a value/cost analysis to both the owner and architect/engineer.

  • Advising the owner of construction methods, materials, and structural components as the project plan matures.

  • Budgeting and cost estimating.

  • Bid packaging and coordination with the architect/engineer.

  • Establishment of operational procedures.

  • Identification of long lead time material items.

  • Organization of responsibilities and work flow projections.

  • Research of the labor market.

  • Bid assessment and qualifying.

  • Awarding of contracts.

  • Contract review and execution.